Kit de pistão Weichai WD615E2 612600030010

Kit de pistão Weichai WD615E2 612600030010

Modelo: WD615.E2
Número da peça: 612600030010
Brands: Poder Weichai

DESCRIÇÃO

If you are not sure about the part number that you need, please provide all the information you have, such as the equipment nameplate, engine nameplate or engine number, or real photos.
EPID offers a wide range of high-quality diesel engine parts including engine overhaul kits, piston assemblies, virabrequins, bielas, camisas de cilindro, main bearings, and other products.

Nós somos 30 Fornecedor de peças de motor a diesel anos
MarcaEPID
Garantia12 Meses
Doença100%Novo
Mais modelosWeichai: WD615, WD618, WP7, WP9, WP10, WP12, WP13
Situação de testePor mar/ar/expresso (DHL/FEDEX/TNT/UPS/EMS/CIDADE)
EmbalagemEmbalagem de exportação padrão ou conforme necessário
Termo de pagamentoL/c, T/T, Western Union, Tradicional
Prazo de entrega3-7 dias (depender da ordem)
Ponto de venda1. Entrega no prazo 2. Garantia de qualidade genuína 3. Fornecedor profissional

FEATURES AND ADVANTAGES OF EPID PISTON

The diesel engine piston is a key component of the engine, it mainly plays the following important role.

Bear Gas Pressure

In the working cycle of a diesel engine, the top of the piston is directly exposed to the pressure of high temperature and high-pressure gases generated by combustion in the combustion chamber. This pressure can be as high as several megapascals (MPa), the piston must be able to withstand this enormous force and will be converted into the crankshaft rotation power. If the piston is not strong enough, it will be deformed or even ruptured under high pressure, resulting in engine failure.

Transmission of Power

The piston is connected to the connecting rod through the piston pin. When the piston moves downward under gas pressure, it transfers the force to the connecting rod. The connecting rod then transmits the force to the crankshaft, causing the crankshaft to rotate. The rotational motion of the crankshaft is the key to the engine’s power output. The reciprocating motion of the piston and the connecting rod and crankshaft work together like a delicate mechanical transmission system to convert the linear power generated by combustion into rotary power to drive the vehicle forward or drive other equipment.

Sealed Combustion Chamber

The bottom of the piston the piston ring and the cylinder wall closely match and play the role of sealing the combustion chamber. The piston ring has a gas ring and an oil ring. The gas ring is mainly used to seal the high-temperature and high-pressure gas in the combustion chamber to prevent gas leakage into the crankcase. The main role of the oil ring is to scrape the excess oil on the cylinder wall, but also to assist the gas ring in sealing.

Control Oil Consumption

As mentioned earlier, the oil ring can scrape off the excess oil on the cylinder wall during the working process of the piston and make it flow back to the oil sump. This can effectively control the consumption of oil to ensure that the engine works within the normal range of oil.

Imagem detalhada

Q&A

What Brands of Engines Do EPID's Diesel Engine Parts Fit?

Weichai: WD615, WD618, WP7, WP9, WP10, WP12, WP13
Baudouin Weichai: 4M06, 6M21, 12M26, 12M33, 20M33, 6WH17, 12WH17, W105, W126, M16, M26.2, M33.2, Série M33, etc.
Cummins: B, DSI, QSB5.9, ISDE, QSB6.7, ISF2.8, ISF3.8, ISF4.5, C, LLC, ISC, CT10, ISM11, QSM11, ISG11, X12, X13, X15, N14, NT855, K19, K38, K50, ISZ
Lagarta: C9, C12, C13, C15, Capítulo 18, 3406, 3408, 3512, 3508, 3176B
Sinotruk: MT13.43-50, MC11, MC13, D12.
Xichi: CA4DF2, CA4DLD-18E5, CA6DM3-50E5, CA6DM3-50E6, CA6DL1-31, CA6DL1-32E3, CA6DL2-35E4, CA6DM2-46E52, CA6DM2-39E3, CA6DL2-35E4
Yuchai: YC6M, YC6K, Yc6j, Yc6g, YC6A300-50, YC4F, YC4E, YC4D, YC6TD1000-D30, YC6G270-30

Quais são os seus termos de embalagem?

Geralmente, embalamos nossos produtos em caixas brancas neutras e caixas marrons. Se você possui uma patente legalmente registrada, podemos embalar as mercadorias em suas caixas de marca depois de receber suas cartas de autorização.

Quais são as suas condições de pagamento?

T/T 30% como depósito, e 70% antes da entrega. Mostraremos as fotos dos produtos e embalagens antes de você pagar o saldo.

Quais são os seus termos de entrega?

EXW, FOB, CFR, CIF, DDU.

Como sobre o seu tempo de entrega?

Geralmente, vai demorar 7 para 15 dias após receber seu pagamento antecipado. O prazo de entrega específico depende dos itens e da quantidade do seu pedido.

Você pode produzir de acordo com as amostras?

Sim, podemos produzir por suas amostras ou desenhos técnicos. Podemos construir os moldes e acessórios.

Qual é a sua política de amostra?

Podemos fornecer a amostra se tivermos peças prontas em estoque, mas os clientes têm que pagar o custo da amostra e o custo do correio.

Como você torna nosso negócio um bom relacionamento e de longo prazo?

1. Mantemos boa qualidade e preços competitivos de kits de reparo para garantir que nossos clientes se beneficiem;
2. Respeitamos cada cliente como nosso amigo e sinceramente fazemos negócios e fazemos amizade com eles, não importa de onde eles venham.

Enviar mensagem

    Fique à vontade para enviar sua consulta no formulário abaixo.

    Responderemos em 24 horas.


      Fique à vontade para enviar sua consulta no formulário abaixo.

      Responderemos em 24 horas.

      Deixe sua mensagem. Vamos responder com você o mais rápido possível.