Heim » Dieselmotoren & Teile » Weichai » Kolben & Komponenten » Weichai Piston Kit WD615E2 612600030010


Weichai Piston Kit WD615E2 612600030010
Modell: WD615.E2
Teilenummer: 612600030010
Brands: Weichai Power
DESCRIPTION
If you are not sure about the part number that you need, please provide all the information you have, such as the equipment nameplate, engine nameplate or engine number, or real photos.
EPID offers a wide range of high-quality diesel engine parts including engine overhaul kits, piston assemblies, Kurbelwellen, Stangenverbindungsstäbe, cylinder liners, main bearings, and other products.
We Are 30 Years Diesel Engine Parts Supplier | |
---|---|
Brand | Epid |
Warranty | 12 Months |
Condition | 100%Neu |
More Models | Weichai: WD615, WD618, WP7, WP9, WP10, WP12, WP13 |
Testing situation | By sea/air/express (DHL/FEDEX/TNT/UPS/EMS/City-line) |
Packing | Standard exporting packing or as required |
Payment Term | L/C, T/t, Western Union, Tradeassurance |
Delivery Time | 3-7 days (depend on order) |
Selling Point | 1. On-time Delivery 2. Genuine Quality Assurance 3. Professional supplier |

FEATURES AND ADVANTAGES OF EPID PISTON
The diesel engine piston is a key component of the engine, it mainly plays the following important role.
In the working cycle of a diesel engine, the top of the piston is directly exposed to the pressure of high temperature and high-pressure gases generated by combustion in the combustion chamber. This pressure can be as high as several megapascals (MPa), the piston must be able to withstand this enormous force and will be converted into the crankshaft rotation power. If the piston is not strong enough, it will be deformed or even ruptured under high pressure, resulting in engine failure.
The piston is connected to the connecting rod through the piston pin. When the piston moves downward under gas pressure, it transfers the force to the connecting rod. The connecting rod then transmits the force to the crankshaft, causing the crankshaft to rotate. The rotational motion of the crankshaft is the key to the engine’s power output. The reciprocating motion of the piston and the connecting rod and crankshaft work together like a delicate mechanical transmission system to convert the linear power generated by combustion into rotary power to drive the vehicle forward or drive other equipment.
The bottom of the piston the piston ring and the cylinder wall closely match and play the role of sealing the combustion chamber. The piston ring has a gas ring and an oil ring. The gas ring is mainly used to seal the high-temperature and high-pressure gas in the combustion chamber to prevent gas leakage into the crankcase. The main role of the oil ring is to scrape the excess oil on the cylinder wall, but also to assist the gas ring in sealing.
As mentioned earlier, the oil ring can scrape off the excess oil on the cylinder wall during the working process of the piston and make it flow back to the oil sump. This can effectively control the consumption of oil to ensure that the engine works within the normal range of oil.
DETAILED PICTURE





Q&A
Weichai: WD615, WD618, WP7, WP9, WP10, WP12, WP13
Baudouin Weichai: 4M06, 6M21, 12M26, 12M33, 20M33, 6WH17, 12WH17, W105, W126, M16, M26.2, M33.2, M33 Series, usw
Cummins: B, ISB, QSB5.9, Der Fall, QSB6.7, ISF2.8, ISF3.8, ISF4.5, C, CJSC, ISC, CT10, ISM11, QSM11, ISG11, X12, X13, X15, N14, NT855, K19, K38, K50, Isz
Raupe: C9, C12, C13, C15, C18, 3406, 3408, 3512, 3508, 3176B
Sinotruk: MT13.43-50, MC11, MC13, D12.
Xichi: CA4DF2, CA4DLD-18E5, CA6DM3-50E5, CA6DM3-50E6, CA6DL1-31, CA6DL1-32E3, CA6DL2-35E4, CA6DM2-46E52, CA6DM2-39E3, CA6DL2-35E4
Yuchai: Yc6m, Yc6k, YC6J, YC6G, YC6A300-50, Yc4f, Yc4e, Yc4d, YC6TD1000-D30, YC6G270-30
Allgemein, Wir packen unsere Waren in neutrale weiße Kisten und braune Kartons ein. Wenn Sie ein legal registriertes Patent haben, Wir können die Waren nach Erhalt Ihrer Autorisierungsbriefe in Ihre Markenkästen packen.
T/t 30% als Einzahlung, Und 70% vor Lieferung. Wir zeigen Ihnen die Fotos der Produkte und Pakete, bevor Sie den Restbetrag bezahlen.
EXW, FOB, CFR, CIF, Das.
Allgemein, es wird dauern 7 Zu 15 Tage nach Erhalt Ihrer Vorauszahlung. Die spezifische Lieferzeit hängt von den Elementen und der Menge Ihrer Bestellung ab.
Ja, Wir können nach Ihren Proben oder technischen Zeichnungen produzieren. Wir können die Formen und Vorrichtungen bauen.
Wir können die Probe liefern, wenn wir vor Lager vorbereitete Teile haben, Die Kunden müssen jedoch die Stichprobenkosten und die Kurierkosten bezahlen.
1. Wir führen von hoher Qualität und wettbewerbsfähigen Reparaturkitpreisen, um sicherzustellen, dass unsere Kunden profitieren;
2. Wir respektieren jeden Kunden als unseren Freund und wir machen aufrichtig Geschäfte und machen uns mit ihnen an, Egal woher sie kommen.